大学事件年表

拥有超过125年的历史, 沃拉沃拉学院, now University, 已经看到了它的审判份额, tragedy, and celebrations. Here, listed in chronological order, is just a sampling of events that have shaped who we are. Sources include Terrie Aamodt’s “A Bold Venture : a History of 沃拉沃拉学院” (1992) and “60 Years of Progress : the Anniversary History of 沃拉沃拉学院” (1952).

1892December 7沃拉沃拉学院 holds its first class, enrollment 103
1896May 18First graduation, three graduates
1897April 25第一棵山白蜡树 planted on campus
1899AugustCollege Bakery opens
1901March 31WWC成立
1902Nov/DecTyphoid epidemic in College Place; three students die
1903JanuarySmallpox epidemic in College Place
1909April 22Jubilee Program celebrates paying off the college debt
 May 24First baccalaureate degree issued
 August 6Artesian well 钻井工人罢工供水
1910October 13The laundry and boiler room at the back of North Hall (old 行政大楼) catch fire; a wind shift saves the residence hall section
1911OctoberNew power plant replaces one destroyed in 1910 fire
1913January 27University of Washington grants accreditation to the preparatory department of WWC for one year
 March 28书院书院书院教会(1st Village Hall) opens
 AutumnWWC入学人数达到 400 students
1914March 9制作扫帚业务 discontinued
 May大学协会 成立(ASWWU的前身)
 Sept. 9Bachelor of Music degree instituted
1915MayWestern Collegian (the first yearbook) is published
1916FebruarySnow storm leaves 48 inches of snow in 54 hours
 SeptemberCollegian (a monthly magazine) is first published
1917MayMountain Ash (the renamed yearbook) is first published
  11名大学生 graduate—a new record
 May 24校友会成立
1918November 3Flu epidemic; college closes for about a week
1919January 18书院书院书院教会(the first Village Hall) burns
 January 28大火烧毁了四楼 旧的广告大楼
1920AprilWWC church opens (the second and current Village Hall)
1922SpringASWWC replaces 大学协会
1924 Science Building (Bowers Hall) completed
1925February 5大学生变成了 weekly paper
1926January 21College enrollment reaches 500 students
1927April 28OPS is established
 Fall约翰逊音乐学院 completed
1928 FallAGA is established
1931Mar. 31-Apr.1大学校园洪水泛滥 covers a few streets in 4-5 ft of water (second photo) (film)
 April 22First accreditation report denies accreditation to WWC
1933July 1Fire destroys most of Rachel Oakes Preston House (women’s residence hall)
 October 17WWC admitted to the Association of Colleges and Secondary Schools of Seventh-day Adventists by the Board of Regents (denominational accreditation)
1934AutumnConard Hall completed
1935January 15WWC receives senior college accreditation from the University of Washington
 April 3WWC receives four-year accreditation from the Northwest Association of Secondary and Higher Schools
19361936康纳德大厅专用
 July 156.0 earthquake rattles windows at WWC
1938August 4Fire in the West Hall basement
1939SpringColumbia Auditorium opens (second photo)
1940Dec. 12Men’s residence hall quarantined because of influenza epidemic
1942 Martin Airfield 是建在大学广场的吗
1944May 11彼得森纪念图书馆 is inhabited
1945Dec. 24大学城 is incorporated
1947Summer护理学院于 波特兰疗养院
 SeptemberSittner Hall它虽未完工,却已被占用
1948Autumn生物学硕士获批准
1950June教育硕士获批准
1954August海事站财产 is purchased at Rosario Beach, near Anacortes, Washington
 AutumnFirst Mask is published
1957OctoberOver 100 residence hall students are incapacitated by the flu
1958 自助餐厅(后来命名为 Kellogg Hall) is built
 OctoberCollege drills a new artesian well to replace 1909 well
1959JanuaryEnrollment raises above 1400 for first time
1962October 20College Church (now University Church) holds first service (建设视频)
1963April 25KGTS-FM 第一次上电视
1964 沃拉沃拉山谷学院 (WWVA)在当前位置打开
 April 29Kretschmar Hall officially named, dedicated November 1st
1965August 22Smith Hall dedicated
 Nov. 14学院面包店关门
1966 West HallCollege Bakeryold swimming pool旧学院/普通建筑 and the academy annex all removed during the school year
 February 27音乐系搬进了 Fine Arts Center,献给12月4日
1967June 2生命科学大楼(Rigby Hall) is dedicated
1969 Alumni Gym (冬季教育中心或WEC) is opened
1970October高层女生宿舍(Foreman Hall) opens
 October 3Biology Lodge near Tollgate, Oregon burns
1971October 11Engineering Department is accredited by the Engineers’ Council for Professional Development
1972April董事会批准购买 Hallmark Apartments去年9月开业
 DecemberCollege is reaccredited for ten years
1973May 17OPS停止运作
1974January 13Clyde and Mary Harris Art Gallery opens
 AutumnHarris Pine Mills 在大学广场开业
1975January 8Fire in a building adjacent to Foreman Hall damages the residence hall building
1976OctoberEnrollment tops 2000 for first time
1977 健康科学办事处开放
1978 Nursing Residence Hall, Portland Campus (Howard Hanson Hall) opens
 SpringOPS reinstated
 March 23Columbia Auditorium 被大火烧毁
 AutumnClasses begin in Industrial Technology Center (now Canaday Technology Center or CTC) (second photo)
1980AprilSociology and Social Work department is accredited by the Council on Social Work Education.
1981 哈夫斯塔德校友中心开放.
 September 4College laundry closes (second photo)
1988JanuaryFirst Master of Social Work classes taught
1994Nov. 3林德格伦化学部 (Rigby) dedication
1996August 20New College Store ribbon cutting
1997 School of Social Work and Sociology opens campus in Missoula, Montana
 April 27Chan Shun Pavilion dedicated
2001 School of Social Work and Sociology opens campus in Billings, Montana
 MayLindgren Hall (Rosario) opens
2003Autumn原行政大楼 demolished (second photo) (third photo)
 Sept. 16山景公寓 official opening
2004August 22罗杰斯基督复临学校 (新)剪彩
 Dec. 17罗杰斯小学 demolished
2007April 28新馆盛大开幕 行政大楼  (second photo)
 September 1沃拉沃拉学院 officially becomes 沃拉沃拉大学
2008SummerSoccer field Completed
2009SummerThe Hebbel-Janke Softball Complex (女子)完成 & 10月4日
2010March快线扩建完成
 NovemberNursing, Health, PE, and Social Work remodeling of WEC finished
2011November 3Atlas Opens
2015 Master of Arts in Media Ministry (changed to Cinema, Religion, and Worldview in 2018) established
2015-2016June - DecemberCollege Avenue reconstruction project; 之前(2015年一般校区) - 之后(一般校园2016) and 之前(College Place 2014) - 之后(College Place 2016)
2017 鲍尔斯大厅改造; 之前(鲍尔斯大厅2017), 翻新(Bowers Hall 2017)Ribbon Ceremony (Bowers Hall 2017), and After (Bowers Hall 2018)
2017 Move of Counseling and Testing Center and University Health Care and remodel of the 大学书店
2020March 13Due to Coronavirus Disease 2019 (COVID-19) pandemic, campus closes and all classes and tests go online for the end of Winter quarter and all Spring quarter. Graduation 2020 is held online for the first time in history!
 JuneFirst doctorate degree offered: Doctor of Social Work
2021August新井开始了 drilled